34.8 C
Dubai
Monday, September 20, 2021

UAE’s ADNOC awards Dh2.7b project for full Belbazem Offshore Block development

Must read

[ad_1]

It covers engineering, procurement, construction, and commissioning activities for the offshore facilities required for full production capacity of 45,000 bpd of light crude and 27 million standard cubic feet per day (mmscfd) of associated gas from Belbazem.

It will have three offshore Well Head Towers (WHTs), one in each of the Block’s three fields, interconnecting sub-sea pipelines, and cables to Zirku Island, located around 60 kilometers from Belbazem field.

The scope also covers the development of greenfield facilities for water injection, produced water treatment, gas compression, and associated utilities as well as brownfield works for tie-in to existing facilities at Zirku Island.

Source by [author_name]

- Advertisement -spot_img

More articles

LEAVE A REPLY

Please enter your comment!
Please enter your name here

- Advertisement -spot_img

Latest article